Video

Video

View some videos of our fleet in action:


a
DPW Hi Rail Multi Crane installing an overhead wire portal boom at Leppington Station South West Rail Link Project.

a


a

DPW Hi Rail Multi Crane with 20t GVM Rail Trailer transporting concrete pre cast culverts at Bullabarra Station platform upgrade project.

a


a

DPW Hi Rail Multi Crane with 20t GVM Rail Trailer transporting concrete pre cast culverts at Bullabarra Station platform upgrade project.

a


a

DPW Hi Rail Multi Crane with 20t GVM Rail Trailer transporting concrete pre cast culverts at Bullabarra Station platform upgrade project.

a


a
DPW Hi Rail Multi Crane with 20t GVM Rail Trailer transporting overhead wire structures at Leppington Station South West Rail Link Project.

a


a

DPW Hi Rail Multi Crane with front and rear 20t GVM Rail Trailer transporting sheet piles to install using Hi Rail Multi Crane.

a


a

DPW 10 Wheeler Crane Truck loading materials onto our 20t GVM Rail Trailer at Harris Park.

a


a

DPW Prime Mover Transporting an oversize Drilling gantry from Castle Hill to Cherry Brook.

a


a
DPW Hi Rail Multi Crane with 20t GVM Rail Trailer distributing materials at Tallawong Station North West Rail Link Project.

a


a
16t Capacity Hercules material handling overhead wire structures on the Newcastle Light Rail Project.

a


a

DPW Hi Rail Multi Crane travelling on track.

a


a
DPW Prime Mover with quad axle low loader transport a Hi Rail Multi Crane at the North West Rail Link Project stabling yard.

a


a

DPW Hi Rail Multi Crane with 20t GVM Rail Trailer transporting High Voltage cable drums for instillation.

a


a
16t Hercules unloading 9t cable drums.

a


a
16t Capacity Hercules material handling overhead wire structures on the Newcastle Light Rail Project.

a


a

DPW x 2 Hi Rail Multi Crane with 20t GVM Rail Trailer transporting High Voltage cable drums for instillation.

Call Now Button